亚洲v欧美v国产v在线观看_客厅丝袜麻麻被进进出出_人妻暴雨中被强制侵犯_无码亚洲一区二区三区_17c精品麻豆一区二区免费_小s货又想挨c了叫大声点视频_女教师口述的刺激性经历_成人免费无码动漫h在线观看_亚洲av 卡通 动漫 自拍

Indonesia 1 Twin Towers Project

Visits : Release time :2017-12-28

With a building area of 306,000 square meters, a building height of 303 meters, 7 underground floors, 59 floors above the ground, an excavation depth of 26.77 meters, and a local excavation depth of 32.2 meters, this Project belongs to a super high-rise and ultra-deep foundation pit project. The important and difficult points in the project management are: plane planning management, schedule management, deepening design management, integration of Chinese and Indonesian technologies, and integration of local resources.

This Project actively studies local practices in Indonesia, and at the same time introduces domestic advanced technologies and sums up the characteristic construction technologies applicable to Indonesia.

Reverse process jump-layer excavation technology: to increase the depth of a single excavation, excavate a two-floor structure construction space at a time, and make the construction of one layer of the structure not occupy the key route, the B2 and B3 layers of this Project adopt the jump-layer excavation technology to remove the pouring of the B2 floor from the key route, and the construction period is effectively shortened by about 52 days.

 

Reverse process jump-layer excavation technology

Soil formwork method construction technology: The excavated soil is used as a natural formwork. After the cushion is poured and the isolation layer is laid, the reinforcing steel is tied and the concrete of the structural floor is poured. Through the application of the soil formwork method, the investment in the floor slab formwork is saved, and the construction period is shortened by about 10 days compared to the conventional formwork construction.

 

Soil formwork method construction technology

Green quick removal system application: Green early removal formwork consists of the steel frame wood formwork panel and the upright tube with the early removal member, which is easy to operate and easy to turn over. Due to the simple operation of the formwork system, the efficiency of the formwork construction is effectively improved, and because it is an early removal system, the one-time input of the formwork is reduced.

 

Green quick removal system application

Chute method construction technology: the bracket and a set of articulated chutes are used to form an articulated chute system to accelerate the concrete pouring speed.

 

Articulated chute method construction technology

BIM technology: The BIM technology is used to conduct the plane layout and simulate the vehicle passing to avoid impeding on-site traffic due to the improper location of material yards. When the on-site operating conditions change, the BIM model is updated in time to ensure that the plane layout is reasonable and feasible. In addition, the BIM technology is used for collision detection, BIM model and animation clarification, project volume calculations and other functions to ensure the operation of the project.

 

BIM technology application


Project aerial view

在线观看亚洲黄色| 女s调教女m女女gl百合视频| 印度女人性猛交视频| 神马午夜一区| 男操女的软件| 亲嘴激烈床视频大全床| 兔子先生高清在线观看| 好涨嗯太深了嗯啊用力停| 高h视频免费在线观看| 少妇被局长大肉疯狂耸动hh| 好大用力深一点高潮视频| 三上悠亚教室高无删减版| 国产精品福利一区| 春闺艳妇高h丽春院头牌| 护士在办公室被狂躁中文字幕| 淫欲的代价完整版| 91蜜臀福利色婷婷| 尿里面好不好宝贝灌尿高h| ktv少少爷互囗交gay| 男女野外做爰全过程6| 欧美高h视频| 强制(h)捆绑调教小说| 《白洁》全集txt下载| 国模视频一区二区| 另类欧美亚洲| 扒开动漫狂揉羞羞漫画| 亚洲国产精华液网站w| 古代h客厅激情嗯啊呻吟| 国产午夜亚洲精品羞羞网站| 伊人网在线播放| 成人三级网址| 性视频毛片| 亚洲 欧美 偷拍 卡通 变态| 欧美成人午夜在线视频| 国产精品久久久久久久久久齐齐| 小龙女淫h侵犯| 双性受夹震蛋h上课bl师生调教| 日本黄在线| 夏目老师电影完整版免费观看| 在线视频你懂| 娇小japansex黑人另类|