Lize SOHO Project

Visits : Release time :2017-12-28

Located in Lize Financial Business District in Fengtai District of Beijing, Lize SOHO Project is designed by the world-famous master Zaha Hadid. It has 4 floors underground and 45 floors above the ground, with a building area of 172.8 thousand square meters and a total height of 200 meters. The metro lines 14 and 16 converge underground here. The design inspiration comes from DNA double helix. The streamlined anti-symmetric surface resembles dragon hovering; the fish scale curtain wall structure is complex; the difficulty of construction is great; the heteromorphic atrium variable curvature is rising. It is the highest in the world.

I. Super high-rise heteromorphic hydraulic creeping formwork construction technology

Lize SOHO Project adopts the super high-rise heteromorphic hydraulic creeping formwork construction technology for construction of core tubes above the ground. This Project has 46 floors of core tubes above the ground; the plane is composed of two symmetrical irregular circular arc walls; the overground structure has a large floor height change with the minimum height of 4.1m and the maximum height of 9.5m, thus the construction difficulty is great. The tower building structure is divided into interpolating steel rib, core tube wall, outer frame steel structure and horizontal steel. The vertical structure of the core tube is constructed first and then the horizontal structure is constructed. The pattern change of the project structure, wall retrieve of the main building and the formwork matching for the core tube wall are complicated.

II. BIM application technology

In terms of BIM application, BIM applications and innovations are selectively applied in combination with the actual needs of the Project. BIM is mainly applied to key technologies of super high-rise buildings, such as steel structures, electromechanical installations, prefabricated component processing, creeping formwork construction control, swing arm and tower crane cooperation, safety protection, intercrossing and matching of various specialties in the construction process of super high-rise buildings, simulation of vertical transportation, and comprehensive management of various departments, etc.

Underground construction of the Project takes the mechanical and electrical reserve and embedding, metro line connection and other parts needing to be deepened into account. The BIM model is used to conduct the setting-out and deepening of the complicated nodes for guiding the on-site construction. During the mechanical and electrical deepening of the Project, BIM software is used to inspect the comprehensive arrangement and collision of the pipelines, to make a collision report and to issue the drawings for approval of the owner and design department.

III. Metro line connection and deep foundation pit construction technology

This Project is constructed in advance, thus the operation time of metro lines 14 and 16 cannot be determined. The temporary blockage needs to be provided at the both ends of the completed metro lines so as to protect the metro line.

There are two innovation points, i.e. waterproof node treatment and temporary blockage and protection.

Project effect diagram


Project atrium


Real scene of the Project upon completion


BIM technology application to the Project


Atrium BIM model

free xxxx movies hd4k| 勾搭了很久的邻居少妇在线观看| 99久久夜色精品国产亚洲1000部| 国产又黄又粗又猛又爽的视频| 情趣店老板调教h| 美女艹b视频| 国产91桃色在线观看网站| 男男被狂c躁到高潮失禁| oldman老头同性tv| 美艳董事长娇乳高耸柳| 皇上的粗大(h)拔不出来| 女人被藏獒日出白浆的小说| 色偷偷偷在线视频播放| 互攻4p嗯啊巨肉寝室| 黄色一级爱情片| 中国夫妇性视频chinese| 欧美大波大乳ⅴideos| 啊啊啊啊不要操了| 美女被吸乳歪歪漫画中国视频| 成人激情免费视频| 亚洲人a成www在线影院| 天天舔天天射| 韩国三级电影网址| 少女教育动漫免费观看高清版| 国产边做饭边被躁bd| 狠狠操五月天| 男男年下调教后菊惩罚h| 色国产精品一区在线观看| 黄色片国产在线观看| 欧美国产激情18| 在按摩店和女老板做爰| ass少妇激情bbwpics0| run away韩剧在线观看高清动漫| 成人国产高清bt种子| 在线电影一区二区| 三年中文在线观看免费国语第五集| 少女大人天国少女免费观看| 老汉玩新婚佳丽少妇小说| 巨大粗h动漫3d扶她怪物| 关晓彤下面好紧进不去h| 学生电梯二次野战视频|